Wooden structure dismantling in Kyiv and Kyiv region

Dismantling of timber decking, battens and small outbuildings. We agree the scope and price from photos and your description before booking.

Description and scope of work

Dismantling of wooden decking, battens and small outbuildings.

Share the structure’s purpose, dimensions and fixings. Send photos of outbuildings from all sides; include the quantity and condition of the structure.

  • The base rate covers only the named task and the agreed quantity.
  • Removing adjoining coverings or framing, disconnecting services and preserving parts are agreed separately where required.
  • Bagging, carrying and waste collection are not automatically included; they are added by agreement.

Removal prices

WorkUnitPrice
Decking disassemblym²300 UAH
Timber floor structure removalm²400 UAH
Small outbuilding disassemblyitem5000 UAH

Measure the quantity in the unit of each price item. The total is calculated using the listed rates and quantities.

Waste carrying

WorkUnitPrice
Waste baggingbag20 UAH
Taking waste down by liftbag45 UAH
Taking waste down stairsbag · floor20 UAH
Waste carrying by volumem³from 600 UAH

Waste bagging, carrying down and carrying by volume are charged separately from the service and vehicle dispatch. Carrying bulky items and loading arrangements are agreed separately.

Vehicle dispatch

Vehicle typeVehicle volumeDispatch price
Gazelle vanup to 3 m³3,000 UAH
GAZon truck5–6 m³4,500 UAH
KamAZ truck10–12 m³7,000 UAH

Vehicle dispatch is charged separately from removal work, bagging, carrying and loading waste. We agree the volume and access arrangements before booking.

Materials and options

Decking disassembly

Timber decking and battens. Provide dimensions, timber condition and whether boards need keeping.
View decking disassembly

Additional services

Waste bagging and carrying are charged according to the separate “Waste carrying” table. Stair carrying is charged per bag and each floor descended. Vehicle dispatch is listed separately; carrying bulky items is assessed by dimensions and access.

How booking works

  1. Enquiry Describe the task, dimensions and work address.
  2. Scope We review materials, fixings, condition and access from photos and your description.
  3. Agreement Confirm the scope, additional services, price and date.
  4. Work We perform the agreed removal; bagging and collection are included if booked.

Frequently asked questions

What the price covers, how to prepare and what to agree before work begins.

Can boards be kept after disassembly?
Identify elements for reuse. Timber condition and fixings affect the result; agree removal method and cost separately.
Does the floor structure rate cover any outbuilding?
No, it covers timber floor structure removal only. Decking, battens and small outbuildings are assessed separately by their components.
What does the base rate cover?
The task and billing unit are listed in the table. We confirm the quantity before booking; additional layers, adjoining elements and other work are agreed separately.
Are bagging, loading and waste collection included?
No, these are agreed separately. Bagging and carrying are listed in the “Waste carrying” table; vehicle dispatch has its own table. Loading and carrying bulky items are assessed by access.
Which photos and details are needed for a quote?
Share the structure’s purpose, dimensions and fixings. Send photos of outbuildings from all sides; include the quantity and condition of the structure.

Book a service

+38 077 918 99 99